Karkheh Regulating Dam & Powerpl  

 

 

 

 

The huge structure of Karkheh Concrete Siphon under karkheh river

 

is located in 10 Km from Hamidieh-Khuzestan province, with 421.7m length is the longest siphon in IRAN and one of the longest in the Middle East. The main quantities of this project are: 1,700,000m3 excavation, 1,200,000m3 embankment, 45,000m3 concrete casting, and 1,700ton of steel reinforcement.

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

  

 

 

 

 

Shoaibiieh pump station No.1

 

is 40Km from Shoshtar, Shoaibieh in Khuzestan province which included 1700m long steel pipe line with the diameter of 1400mm, 330m concrete cannel and implementation of a pump station.(2.5 m3 /sec)  The main quantities of this project are: 330,000m3 excavation, 6,000m3 concrete casting and 18,000m2 formwork.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

 

Avan Irrigation System

 

is located in 40 Km north of Andimeshk in Khuzestan province with the area of 13,000ha. The main quantities of the project are: 9,200m steel pipe line (900-1400mm diameter), 46km long concrete channel The main quantities of this project are:, 1,300,000m3 excavation in rock and soil, 1,100,000m3 embankment, 55,000m3 concrete casting and  83,000m2  formwork.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

 

Dosalagh Irrigation and Drainage System

 

in Khuzestan province with the area of 9,000ha, 50km channel and 378 concrete structures. The main quantities of the project are: 1,900,000m3 excavation in rock and soil and 860,000m3 embankment, 24,000m3 concrete casting and 42,000m2 formwork.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

Water Intake of Azadegan main canal (AMC)

 

is Near Hamidieh-Khuzestan province, made of concrete, constructed 12m under water level. The main quantities of the project are: 480,000m3 excavation, 15,000m3 concrete casting and 9,800m2 formwork.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

Construction of Dezfool Sewage-Treatment Plant.

 

The main quantities of the project are: 210,000m3 excavation, 200,000m3 embankment, 27,000m3 concrete casting, 650ton steel bar fabrication and 15,000m2 formwork.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 