Login  

Farsi

Karkheh Regulating Dam & Powerpl  

 

 

 

 

Construction of Northern extension of line No.1 – (section II) of Tehran subway

 

(in shariaty st. ,between Mirdamad St. and Zafar St.) with the total length of 1,592m, Excavation height with=6.8m & width=8.2m

 

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

 

 

Construction of T1 metro station of Tehran metro line1,

 

by NATM method (underground), width=18m, height=13m, length=140m, The main quantities of this project are: 45,000m3 underground excavation, 37,000m3 concrete casting, 3,300ton of steel reinforcement.

 

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

 

Construction of  X1 metro station of Tehran metro line 1,

 

in Ghods sq. by NATM method (underground), width=19m, height=21m, length=240m. The main quantities of this project are: 160,000m3 underground excavation, 55,000m3 concrete casting and 8,500ton of steel reinforcement.

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

 

Construction of Defae Moghaddas (soffeh) metro station in Isfahan.

 

The main quantities of this project are: 12,000m2 total area, 230,000m3 earthwork (excavation and earth fill), 43,000m3 concrete casting, 5000ton of steel reinforcement.

 

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

 

 

 

 

Construction of  Daneshgah metro station in Isfahan,

 

in Hezar Jarib Street, The main quantities of this project are: 14,000m2 total area, with 38,000m3 earthwork, 29,000m3 concrete casting and 2,300 tons of steel Reinforcement.

 

 

♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦♦

Copyright 2010 by JAHANKOWSAR